Battery-Powered Wall-Mount Hoop
Universal for the 18" and 3' overhang models. Read the whole guide before you start, and read each step through before you begin it.
Safety Instructions
- Backing first, always. Make sure there is proper backing in the wall before the hoop is installed. Do not install the hoop until there is proper backing.
- Work at height carefully. Scaffolding is recommended. If a ladder is being used during installation, use extreme caution. We recommend 2–3 people.
- Lift with help. Installation and assembly requires lifting and bending that can result in injury if you are not accustomed to this type of lifting.
- Climate, corrosion and misuse could result in system failure.
- Never hang on any part of the hoop. That includes the rim, arms, arm supports, wall plate and net.
- Keep faces clear. While playing, keep faces away from the rim, backboard, net or anything that could cause damage to teeth, face or body — especially during dunking motions.
- Remove jewellery and loose items that could get entangled in the net or lodged in any other part of the hoop.
- Inspect regularly. Check the hoop for loose hardware or corrosion. Never play on damaged equipment.
Wall Backing Requirements
This hoop puts real load into your wall. Backing goes in before anything else gets mounted.
Sheetrock walls
- Fill 88" to 120" from the floor. Locate the centre of the wall where the hoop is going, then fill that entire band with clear lumber free of knots, cracks, warping or cuts.
- 2"x10" or 2"x12" clear lumber, doubled — total backing thickness a minimum of 3 inches. LVL (laminated veneer lumber) also works.
- Fill the stud cavity front to back. All backing runs horizontally and is properly secured into 3 studs.
- Cover the plate footprint. The wall plate bracket is 17-3/4" wide — make sure there is backing in all stud cavities in that area.
- 1,000 lb rating. The backing must withstand 1,000 lbs of downward force. Consult a structural engineer for assistance.
- Ledge on the wall? Build a box up from the ledge to reach the required backing height so the bracket sits flush on the wall.
Concrete walls
Solid 8"-thick concrete built at the correct height needs no additional backing. If the wall is not 8" thick, consult a structural engineer. Any concrete added to reach spec must still withstand 1,000 lbs of downward force.
Hollow or cinderblock walls
Consult a structural engineer before installing any portion of this product.
See the interactive wall backing guide
Pick your wall type — sheetrock at framing or finished stage, concrete, post-frame/shed or cinderblock — and get the exact backing layout with dimensioned diagrams.
Parts & Tools
Tools required
- Adjustable wrench
- Screwdriver
- Tape measure
- Power / impact drill
- Level
- Scaffolding or a ladder
Parts included
- Wall plate x1
- Rubber cushion x1
- Lower support arms x2
- Battery holder x1
- Actuator support plates x2
- Rechargeable battery x1
- Upper support arm x1
- Controller box x1
- Battery-powered actuator x1
- Height indicator stickers 1 set
- Backboard x1
- Anti-seize compound x1
- Rim x1
- A23 battery (for remote) x1
Hardware Included
Bolt letters A–H match the assembly steps below. Print the actual-size reference pages in the PDF manual to identify each fastener against its outline.
| Bolt | Imperial size | Metric | Qty | Step | Where it goes |
|---|---|---|---|---|---|
| ABolt A | 5/8" x 4-5/16" hex bolt | 16 x 110 mm | x2 | Step 2 | Lower arms & actuator plates to wall plate |
| BBolt B | 5/8" x 1-3/8" hex bolt | 16 x 35 mm | x2 | Step 2 | Actuator support plates to wall plate |
| CBolt C | 5/8" x 10-13/16" hex bolt | 16 x 275 mm | x1 | Step 3 | Upper support arm to wall plate |
| DBolt D | 5/8" x 2-3/16" hex bolt | 16 x 55 mm | x1 | Step 4 | Actuator & height indicator to upper arm |
| EBolt E | 5/8" x 4-5/16" hex bolt | 16 x 110 mm | x1 | Step 4 | Actuator & height indicator to actuator plates |
| FBolt F | 9/16" x 1-9/16" hex bolt | 14 x 40 mm | x2 | Step 5 | Backboard to upper support arm |
| GBolt G | 5/8" x 10-1/4" hex bolt | 16 x 260 mm | x1 | Step 5 | Backboard to lower support arms |
| HBolt H | 9/16" x 1-15/16" hex bolt | 14 x 50 mm | x4 | Step 6 | Rim to backboard (with rubber cushion) |
| SScrew | 5/32" x 1-3/16" self-tapping | ST4 x 30 mm | x4 | Step 7 | Battery holder & controller box to wall |
Washers & nuts: 5/8" flat x16 · 9/16" flat x12 · 5/8" lock nut x8 · 9/16" lock nut x2 · 9/16" split lock washer x4 · 9/16" hex nut x4
Step A / B — Where The Base Frame Goes
The mounting height depends on which overhang you bought. Pick yours and the numbers below follow.
Not sure? Measure from the wall to the face of the backboard.
Step A — 18" overhang
Choose an appropriate place to install your battery-powered actuator wall-mounted basketball hoop. With the 18" overhang model, the bottom of the base frame must be 92" from the floor.
Wall Plate Installation
Seven steps to get the plate on the wall square, level and holding.
Find the centre
Locate the centre of the room where you want to install the hoop.
Mark the height
For a 36" overhang hoop, measure 88" from the floor and make a mark. For an 18" overhang hoop, measure 92" from the floor and make a mark.
Position the wall plate
The wall plate is 17-3/4" wide. From the centre mark, measure 8-7/8" to the left or right; this marks the edge where the wall plate will be placed. Set up scaffolding in this area.
Secure the wall plate
With two people, one person holds the wall plate at the bottom mark (92") while the other slides it to align with the edge mark. Use a level to ensure the plate is straight both horizontally and vertically.
Pre-drill the holes
The person not holding the wall plate should pre-drill one hole at the upper left, and one at the second hole down from the top on the right side.
Attach mounting hardware
Use (2) 1/2" x 4" lag bolts (not included) to secure the wall plate to the wall, only at the 2 anchor points previously drilled. An impact drill works best. Tighten the lag bolts all the way to the wall plate.
Continue the install
Once the wall plate is secured with the 2 mounting anchors, proceed with installing the remainder of the hoop. Ensure you have proper backing before continuing.
Steps 1–7
Apply anti-seize to every fastener as you go.
Wall plate
Attach the wall plate to the wall with two 1/2" x 4" lag bolts (not included). Pre-drill before driving the lag bolts, and use mounting hardware appropriate for your wall surface. The remaining 12 wall anchors are installed during the Final Step, after the backboard has been levelled.
Lower support arms & actuator plates
Attach the two lower support arms and the two actuator support plates to the wall plate using the hardware below, then tighten all firmly.
- ABolt A · 5/8" x 4-5/16" hex bolt ×2+ 5/8" washers x4, lock nuts x2 · arms & plates
- BBolt B · 5/8" x 1-3/8" hex bolt ×2+ 5/8" washers x4, lock nuts x2 · plate other end
Upper support arm
Attach the upper support arm to the wall plate using the hardware below.
- CBolt C · 5/8" x 10-13/16" hex bolt ×1+ 5/8" flat washers x2, 5/8" lock nut x1
Actuator & height indicator
Attach the battery-powered actuator and the height indicator to the upper support arm and actuator support plates. The height indicator attaches with the same bolt that secures the actuator to the upper arm — it goes on the outer sides of the actuator mounting tabs. Keep the protective pad on the actuator during assembly.
- DBolt D · 5/8" x 2-3/16" ×1+ 5/8" washers x2, lock nut x1 · top
- EBolt E · 5/8" x 4-5/16" ×1+ 5/8" washers x2, lock nut x1 · bottom
Backboard
Attach the backboard to the upper support arm and the lower support arms. This step requires two people: rest the backboard on your scaffolding (or have a helper support it) while you align the holes. Never let the backboard hang unsupported until all hardware is fully tightened.
- FBolt F · 9/16" x 1-9/16" ×2+ 9/16" washers x4, lock nuts x2 · to upper arm
- GBolt G · 5/8" x 10-1/4" ×1+ 5/8" washers x2, lock nut x1 · to lower arms
Rim
Attach the rim to the backboard. Remember to place the rubber cushion between the rim and the backboard.
- HBolt H · 9/16" x 1-15/16" ×4+ 9/16" washers x8, split lock washers x4, hex nuts x4
Battery holder & controller box
Secure the battery holder to the wall next to the wall plate, then secure the controller box next to the battery holder.
- SSelf-tapping screws · 5/32" x 1-3/16" ×4(ST4 x 30 mm)
Installing the actuator kit on its own?
The battery, control box and remote have their own full install and owner's manual — wiring, charging, battery care and troubleshooting.
Battery, Controller & Remote
Your hoop comes pre-wired and assembled. This is what each control does, and how to put it right if something comes loose.
Battery pack functions
Charge port
Accepts the supplied charger only.
On / off switch
Powers the entire system.
Battery life indicator
Press to read the remaining charge.
Battery lock
Secures the battery to its wall mount.
Controller box & wiring
The wireless controller box is located inside the metal junction box. On the board you'll find the manual actuator adjusting buttons, the DIP switch, and the LRN (learn) button used to pair the wireless remote.
If a wire has come loose: using a screwdriver, unscrew the connection screws for the slots that are disconnected. Insert the copper end of the disconnected wire into the corresponding slot, hold the wire in place and screw the removed screw back in, making sure it is firmly tightened and the wire is not loose. The left pair is the battery mount; the right pair is the actuator connection.
Wireless remote & receiver pairing
The wireless remote uses one A23 battery — included with your hoop. Remotes ship pre-paired; use this only as a troubleshooting method.
- Power on the wireless receiver using the provided rechargeable battery. The indicator LED should light up and you will hear a beep.
- Locate the LRN (learning) button on the right side of the receiver.
- Press and hold the learning button for about 2 seconds until the LED flashes — the receiver is now in pairing mode.
- Within 5 seconds, press one button on the remote (for example, UP).
- The LED will blink quickly, then stay on — that means pairing succeeded.
- To exit learning mode, wait a few seconds or tap the learning key again.
DIP mode — both OFF
The hoop only moves while an actuator button is held. Best for small incremental up/down control.
DIP mode — 1 ON, 2 OFF
One click of up/down and the actuator moves until the STOP button on the remote is pushed.
The two red switches labelled "1" and "2" control the relay behaviour. OFF is toward the numbers; ON is toward "ON".
Stickers, Level & The Final 12 Anchors
Height indicator stickers
Apply the 10' height indicator sticker to the inner tube of the battery-powered actuator: using the wireless remote, raise the rim to 10', confirm the rim height with a tape measure, then place the sticker at that height.
Repeat the same procedure for each of the remaining stickers (6', 7', 8' and 9'): raise the rim, confirm the height with your tape measure, and apply the matching sticker each time.
Levelling the rim
Place a level on the rim of the hoop, checking with the level perpendicular to the backboard. Using a #6 Allen wrench, tighten or loosen the set screw on top of the rim to adjust the pitch of the rim up or down.
Final step — install the remaining anchors
Now that the hoop is completely assembled, adjust it so the rim is at 10' from the floor. Use a level on top of the backboard to check that it is level. If it is not, slightly loosen one of the 2 installed wall anchors and adjust the wall plate until the backboard is level — one person adjusts the wall plate while another checks the level.
Final check — before you shoot
- All 14 wall anchors installed and engaging the backing
- Backboard level, checked on top with a level
- Rim level, checked perpendicular to the backboard
- Anti-seize applied to all assembly hardware
- Every bolt tightened firmly
- Height stickers applied at 6', 7', 8', 9' and 10'
- Battery locked and the keys stored indoors
- Remote raises, stops and lowers the hoop cleanly
Questions about your install? Call us at 651-269-5950 — have your order number and a photo of the wall ready.