Skip to content
Free shipping on all wall-mounted battery powered hoops
Installation Guide

Battery-Powered Wall-Mount Hoop

Universal for the 18" and 3' overhang models. Read the whole guide before you start, and read each step through before you begin it.

2–3 peopleRecommended crew
ScaffoldingOr a ladder, with care
14 anchors1/2" x 4" lag bolts, not included
Rim at 10'When raised to full height
Before you start

Safety Instructions

  • Backing first, always. Make sure there is proper backing in the wall before the hoop is installed. Do not install the hoop until there is proper backing.
  • Work at height carefully. Scaffolding is recommended. If a ladder is being used during installation, use extreme caution. We recommend 2–3 people.
  • Lift with help. Installation and assembly requires lifting and bending that can result in injury if you are not accustomed to this type of lifting.
  • Climate, corrosion and misuse could result in system failure.
  • Never hang on any part of the hoop. That includes the rim, arms, arm supports, wall plate and net.
  • Keep faces clear. While playing, keep faces away from the rim, backboard, net or anything that could cause damage to teeth, face or body — especially during dunking motions.
  • Remove jewellery and loose items that could get entangled in the net or lodged in any other part of the hoop.
  • Inspect regularly. Check the hoop for loose hardware or corrosion. Never play on damaged equipment.
Before you start

Wall Backing Requirements

This hoop puts real load into your wall. Backing goes in before anything else gets mounted.

Do not install without proper backing Failure to follow proper backing instructions may result in property damage, serious injury, or possibly death.

Sheetrock walls

  • Fill 88" to 120" from the floor. Locate the centre of the wall where the hoop is going, then fill that entire band with clear lumber free of knots, cracks, warping or cuts.
  • 2"x10" or 2"x12" clear lumber, doubled — total backing thickness a minimum of 3 inches. LVL (laminated veneer lumber) also works.
  • Fill the stud cavity front to back. All backing runs horizontally and is properly secured into 3 studs.
  • Cover the plate footprint. The wall plate bracket is 17-3/4" wide — make sure there is backing in all stud cavities in that area.
  • 1,000 lb rating. The backing must withstand 1,000 lbs of downward force. Consult a structural engineer for assistance.
  • Ledge on the wall? Build a box up from the ledge to reach the required backing height so the bracket sits flush on the wall.

Concrete walls

Solid 8"-thick concrete built at the correct height needs no additional backing. If the wall is not 8" thick, consult a structural engineer. Any concrete added to reach spec must still withstand 1,000 lbs of downward force.

Hollow or cinderblock walls

Consult a structural engineer before installing any portion of this product.

See the interactive wall backing guide

Pick your wall type — sheetrock at framing or finished stage, concrete, post-frame/shed or cinderblock — and get the exact backing layout with dimensioned diagrams.

Open the guide
Before you start

Parts & Tools

Tools required

  • Adjustable wrench
  • Screwdriver
  • Tape measure
  • Power / impact drill
  • Level
  • Scaffolding or a ladder

Parts included

  • Wall plate x1
  • Rubber cushion x1
  • Lower support arms x2
  • Battery holder x1
  • Actuator support plates x2
  • Rechargeable battery x1
  • Upper support arm x1
  • Controller box x1
  • Battery-powered actuator x1
  • Height indicator stickers 1 set
  • Backboard x1
  • Anti-seize compound x1
  • Rim x1
  • A23 battery (for remote) x1
Not included — wall-mounting hardware You must supply the hardware that attaches the wall plate to your wall. For wood backing we recommend (14) 1/2" x 4" lag bolts — pre-drill before driving each one. A total of 14 mounting anchors is required: 2 during Step 1, and the remaining 12 during the Final Step. If you have any questions about your backing or wall-mounting hardware, consult a structural engineer.
Before you start

Hardware Included

Bolt letters A–H match the assembly steps below. Print the actual-size reference pages in the PDF manual to identify each fastener against its outline.

BoltImperial sizeMetricQtyStepWhere it goes
ABolt A5/8" x 4-5/16" hex bolt16 x 110 mmx2Step 2Lower arms & actuator plates to wall plate
BBolt B5/8" x 1-3/8" hex bolt16 x 35 mmx2Step 2Actuator support plates to wall plate
CBolt C5/8" x 10-13/16" hex bolt16 x 275 mmx1Step 3Upper support arm to wall plate
DBolt D5/8" x 2-3/16" hex bolt16 x 55 mmx1Step 4Actuator & height indicator to upper arm
EBolt E5/8" x 4-5/16" hex bolt16 x 110 mmx1Step 4Actuator & height indicator to actuator plates
FBolt F9/16" x 1-9/16" hex bolt14 x 40 mmx2Step 5Backboard to upper support arm
GBolt G5/8" x 10-1/4" hex bolt16 x 260 mmx1Step 5Backboard to lower support arms
HBolt H9/16" x 1-15/16" hex bolt14 x 50 mmx4Step 6Rim to backboard (with rubber cushion)
SScrew5/32" x 1-3/16" self-tappingST4 x 30 mmx4Step 7Battery holder & controller box to wall

Washers & nuts: 5/8" flat x16 · 9/16" flat x12 · 5/8" lock nut x8 · 9/16" lock nut x2 · 9/16" split lock washer x4 · 9/16" hex nut x4

Anti-seize is required on all hardware Apply the provided anti-seize compound to all assembly hardware before installing — a pea-sized amount 1/4" down from the start of the bolt threads. Bolts can seize if anti-seize is not applied. Misplaced yours? Nickel anti-seize paste is sold at most hardware stores.
Mounting height

Step A / B — Where The Base Frame Goes

The mounting height depends on which overhang you bought. Pick yours and the numbers below follow.

Your overhang

Not sure? Measure from the wall to the face of the backboard.

Floor Wall Base frame Backboard Rim 18" 92" 10' rim
Step A — 18" overhang model

Step A — 18" overhang

Choose an appropriate place to install your battery-powered actuator wall-mounted basketball hoop. With the 18" overhang model, the bottom of the base frame must be 92" from the floor.

Why it matters Mounting at 92" puts the rim at exactly 10' when the hoop is raised to full height.
Which step applies to you? If you purchased the hoop with the 18" safety distance, follow Step A. If your hoop has the 3' safety distance, follow Step B. The rest of the assembly is identical for both models — only the mounting height and the actuator's overhang hole change.
Mounting height

Wall Plate Installation

Seven steps to get the plate on the wall square, level and holding.

1

Find the centre

Locate the centre of the room where you want to install the hoop.

2

Mark the height

For a 36" overhang hoop, measure 88" from the floor and make a mark. For an 18" overhang hoop, measure 92" from the floor and make a mark.

3

Position the wall plate

The wall plate is 17-3/4" wide. From the centre mark, measure 8-7/8" to the left or right; this marks the edge where the wall plate will be placed. Set up scaffolding in this area.

4

Secure the wall plate

With two people, one person holds the wall plate at the bottom mark (92") while the other slides it to align with the edge mark. Use a level to ensure the plate is straight both horizontally and vertically.

5

Pre-drill the holes

The person not holding the wall plate should pre-drill one hole at the upper left, and one at the second hole down from the top on the right side.

6

Attach mounting hardware

Use (2) 1/2" x 4" lag bolts (not included) to secure the wall plate to the wall, only at the 2 anchor points previously drilled. An impact drill works best. Tighten the lag bolts all the way to the wall plate.

7

Continue the install

Once the wall plate is secured with the 2 mounting anchors, proceed with installing the remainder of the hoop. Ensure you have proper backing before continuing.

Stop if the hardware isn't biting If any mounting hardware is not engaging with the backing — stop. Remove the wall plate and fix the backing before continuing.
Recommendation Install the top-left anchor and the second anchor down on the right-hand side of the wall plate first. This lets you adjust the wall plate after the installation is complete: once the hoop is fully assembled, raise it so the rim is at 10', put a level on top of the backboard, and adjust the wall plate to level the backboard if need be. After it is level, install the remaining 12 anchors (see the Final Step).
Assembly

Steps 1–7

Apply anti-seize to every fastener as you go.

1

Wall plate

Attach the wall plate to the wall with two 1/2" x 4" lag bolts (not included). Pre-drill before driving the lag bolts, and use mounting hardware appropriate for your wall surface. The remaining 12 wall anchors are installed during the Final Step, after the backboard has been levelled.

Important For a wood backing scenario, both lag bolts must be securely fastened into the wood backing. If they are not, DO NOT install this hoop — reinstall the backing first.
2

Lower support arms & actuator plates

Attach the two lower support arms and the two actuator support plates to the wall plate using the hardware below, then tighten all firmly.

Hardware for this step
  • ABolt A · 5/8" x 4-5/16" hex bolt ×2+ 5/8" washers x4, lock nuts x2 · arms & plates
  • BBolt B · 5/8" x 1-3/8" hex bolt ×2+ 5/8" washers x4, lock nuts x2 · plate other end
3

Upper support arm

Attach the upper support arm to the wall plate using the hardware below.

Hardware for this step
  • CBolt C · 5/8" x 10-13/16" hex bolt ×1+ 5/8" flat washers x2, 5/8" lock nut x1
Tip 1 — use the right hole Make sure you install through the hole that corresponds with your hoop's overhang: 18".
Tip 2 — leave the electronics for later Wait to install the battery and controller box until the actuator has been successfully installed. This ensures the actuator will have proper cable length.
4

Actuator & height indicator

Attach the battery-powered actuator and the height indicator to the upper support arm and actuator support plates. The height indicator attaches with the same bolt that secures the actuator to the upper arm — it goes on the outer sides of the actuator mounting tabs. Keep the protective pad on the actuator during assembly.

Hardware for this step
  • DBolt D · 5/8" x 2-3/16" ×1+ 5/8" washers x2, lock nut x1 · top
  • EBolt E · 5/8" x 4-5/16" ×1+ 5/8" washers x2, lock nut x1 · bottom
Check the overhang hole The actuator and height indicator each have two mounting holes. Use the hole that matches your hoop: 18" overhang.
5

Backboard

Attach the backboard to the upper support arm and the lower support arms. This step requires two people: rest the backboard on your scaffolding (or have a helper support it) while you align the holes. Never let the backboard hang unsupported until all hardware is fully tightened.

Hardware for this step
  • FBolt F · 9/16" x 1-9/16" ×2+ 9/16" washers x4, lock nuts x2 · to upper arm
  • GBolt G · 5/8" x 10-1/4" ×1+ 5/8" washers x2, lock nut x1 · to lower arms
6

Rim

Attach the rim to the backboard. Remember to place the rubber cushion between the rim and the backboard.

Hardware for this step
  • HBolt H · 9/16" x 1-15/16" ×4+ 9/16" washers x8, split lock washers x4, hex nuts x4
7

Battery holder & controller box

Secure the battery holder to the wall next to the wall plate, then secure the controller box next to the battery holder.

Hardware for this step
  • SSelf-tapping screws · 5/32" x 1-3/16" ×4(ST4 x 30 mm)
Tool for this step Use a screwdriver for the self-tapping screws — do not over-tighten.

Installing the actuator kit on its own?

The battery, control box and remote have their own full install and owner's manual — wiring, charging, battery care and troubleshooting.

Actuator manual
Electronics & power

Battery, Controller & Remote

Your hoop comes pre-wired and assembled. This is what each control does, and how to put it right if something comes loose.

Reminder Charge the battery before beginning the install.

Battery pack functions

Charge port

Accepts the supplied charger only.

On / off switch

Powers the entire system.

Battery life indicator

Press to read the remaining charge.

Battery lock

Secures the battery to its wall mount.

Seating the battery Guide the battery through the rails on the battery mount, then firmly slide it to the bottom of the mount — you should feel it click into place. If the battery will not slide down, make sure the battery is unlocked and that the screws attaching the mount to the wall are not protruding and blocking the battery. The mount goes on the wall with the slots this side up.

Controller box & wiring

The wireless controller box is located inside the metal junction box. On the board you'll find the manual actuator adjusting buttons, the DIP switch, and the LRN (learn) button used to pair the wireless remote.

Disconnect power first Always make sure there is no power running to the hoop during any rewiring or reconnecting. Remove the battery from the input mount, then press up and down on the remote to confirm the power has been disconnected.

If a wire has come loose: using a screwdriver, unscrew the connection screws for the slots that are disconnected. Insert the copper end of the disconnected wire into the corresponding slot, hold the wire in place and screw the removed screw back in, making sure it is firmly tightened and the wire is not loose. The left pair is the battery mount; the right pair is the actuator connection.

Wireless remote & receiver pairing

The wireless remote uses one A23 battery — included with your hoop. Remotes ship pre-paired; use this only as a troubleshooting method.

  1. Power on the wireless receiver using the provided rechargeable battery. The indicator LED should light up and you will hear a beep.
  2. Locate the LRN (learning) button on the right side of the receiver.
  3. Press and hold the learning button for about 2 seconds until the LED flashes — the receiver is now in pairing mode.
  4. Within 5 seconds, press one button on the remote (for example, UP).
  5. The LED will blink quickly, then stay on — that means pairing succeeded.
  6. To exit learning mode, wait a few seconds or tap the learning key again.
Erasing all paired remotes Hold the learning button for about 8–10 seconds until the LED flashes rapidly, then release. All remote pairings will be cleared.

DIP mode — both OFF

The hoop only moves while an actuator button is held. Best for small incremental up/down control.

DIP mode — 1 ON, 2 OFF

One click of up/down and the actuator moves until the STOP button on the remote is pushed.

The two red switches labelled "1" and "2" control the relay behaviour. OFF is toward the numbers; ON is toward "ON".

Finishing up

Stickers, Level & The Final 12 Anchors

8

Height indicator stickers

Apply the 10' height indicator sticker to the inner tube of the battery-powered actuator: using the wireless remote, raise the rim to 10', confirm the rim height with a tape measure, then place the sticker at that height.

Repeat the same procedure for each of the remaining stickers (6', 7', 8' and 9'): raise the rim, confirm the height with your tape measure, and apply the matching sticker each time.

9

Levelling the rim

Place a level on the rim of the hoop, checking with the level perpendicular to the backboard. Using a #6 Allen wrench, tighten or loosen the set screw on top of the rim to adjust the pitch of the rim up or down.

10

Final step — install the remaining anchors

Now that the hoop is completely assembled, adjust it so the rim is at 10' from the floor. Use a level on top of the backboard to check that it is level. If it is not, slightly loosen one of the 2 installed wall anchors and adjust the wall plate until the backboard is level — one person adjusts the wall plate while another checks the level.

Install the remaining (12) 1/2" x 4" lag bolts Once the backboard is level, install the remaining 12 wall anchors into the wall plate — 14 total. Pre-drill, then drive each lag bolt, making sure every bolt engages the backing. This is the most important part of the installation — do not skip it. If any anchor does not engage the backing, stop and fix the backing before using the hoop.
Caution While adjusting, do not loosen the anchors enough to allow the hoop to tip, fall, or become unsafe. Make sure the anchor is still engaged into the backing.

Final check — before you shoot

  • All 14 wall anchors installed and engaging the backing
  • Backboard level, checked on top with a level
  • Rim level, checked perpendicular to the backboard
  • Anti-seize applied to all assembly hardware
  • Every bolt tightened firmly
  • Height stickers applied at 6', 7', 8', 9' and 10'
  • Battery locked and the keys stored indoors
  • Remote raises, stops and lowers the hoop cleanly

Questions about your install? Call us at 651-269-5950 — have your order number and a photo of the wall ready.